Description
Black & white photo image.
on back : Designed to pump sewage and force it underwater into the Ohio River when the river rises to a stage of 43 feet. Beneath this superstructure is a well holding two electric engines capable of pumping 12,000 gallons of sewage. The reservoir beneath this pumping station holds 160,000 gallons of sewage and storm water. Cost of this station was 51,000 of which the WPA paid 40,000.